Thursday, September 13, 2007

August 23- September 2, 2007







The pink foam is all in, and now it is time for us to put in the first layer of sand. 9 inches of sand in the bottom of the bathtub, which we will compact with a borrowed plate compactor (thanks George Ramos!).

On this first sand layer we placed a welded wire mesh to act as our guide for installing the PEX radiant tubing that will put the heat into the sandbox. After we have the PEX tubing installed we dump yet more and more sand, filling up the sandbox to within 6 inches of the top (Ken's side) and 4 inches of the top (Adele's side). At the entrance to Ken's side we leave a deeper depression in the sand to create a very thick entry floor for heavy trucks.

Thankfully we did not forget to install the half bath plumbing before we put in all the sand. We also put in a drainage lines for both studio's floor drains. These drains will actually go out to the garden, since it will be runoff from Ken's stone carving water and Adele's greywater dump.

3 comments:

Anonymous said...

amara flash menu maker 2.0 crack
exceed 10 warez
audiolabel 2.2 crack
oxygen xml editor v6 1 eclipse plugin incl keygen
ulead moviefactory crack
dragon naturally speaking warez
crack vcd cutter 4.03
pcrawler crack
system mechanic 4.0j crack
microsoft office 2000 cd key crack




virtuosa 5 crack
acoustica cd dvd label maker 2.48 crack
tag and rename crack
adobe photoshop cs keygen
alice keygen
myipsuite crack
planmagic business warez
pro logic 7 crack
newsshark warez
ultimate troubleshooter 2.41 crack
musicmatch 8.1 crack
nero serial number crack
bejeweled registration crack
dfx keygen
jamagic crack

Anonymous said...

Unfortunately, I can help nothing, but it is assured, that you will find the correct decision.

Anonymous said...

It's actually a great and useful piece of information. I'm happy that you shared this helpful info
with us. Please keep us informed like this. Thanks for
sharing.

Stop by my site - technomate 6900